Subdivisions and Survey for Engineers and Surveyors
Instructions and forms intended for engineering and land survey professionals.
Do Not Print Out Construction Plans or Other Documents
Construction plans and documents are to be submitted electronically. Paper documents are not accepted when applying for a permit.
The instructions and forms listed below are undergoing review. Some may still contain outdated instructions to print out copies of construction plans and documents. Please ignore that instruction and submit electronically. Only print items if directly instructed by Permit Sonoma for your situation.
Instructions and Forms
-
CSS-019 Minimum Standard Site Plan Requirements
Minimum standard site plan requirements for most applications at Permit Sonoma. (Planning applications have different site plan requirements.) (Version: 06/25/2024) -
ENG-005 Engineering Division Services At Cost Fee Agreement (PDF)
Agreement between (Applicant), and the Permit Sonoma for Engineering at-cost Fee (PDF: 324 kB) (Version: 02/28/2020) -
SUR-001 Parcel/Final Map Submittal Requirements Checklist
This checklist provides general guidelines/minimum requirements for subdivision maps. (Version: 06/01/2022) -
SUR-003 Record of Survey Submittal Requirements Checklist
This checklist provides general guidelines/minimum requirements for Record of Survey. (Version: 06/01/2022)