- Accessory Units and Junior Units
- Agricultural Uses
- Agricultural Zoning Ordinance
- Cannabis Program
- County Code for Permit Sonoma
- Housing Urgency Ordinances
- Renewable Energy
- Septic Regulations
- Universal Design
- Water Efficient Landscape Ordinance
-
- Winery Events Calendar
- General Noise Standards
- Winery Use Permit Application Process
- Application Fees
- Required Site Specific Studies for Wineries
- Private Guest Accommodations
- Examples of Winery Project Descriptions and Conditions of Approval
- Areas of Local Concentration
- Draft Guidelines Dry Creek Valley
- Traffic Studies
- Use Permit Application Forms
- Document and Map Listings
- Z Accessory Dwelling Unit Exclusion Removal
- Back to Renewable Energy
General Development Standards
Purpose
In order to reduce uncertainty and ensure uniform treatment of renewable energy facilities, a set of general development standards are provided that are applicable to all Renewable Energy Facilities. Additional standards have also been developed for certain types of renewable energy generation facilities, including solar, bioenergy and wind systems.
Applicability
Permit Requirements
Commercial Renewable Energy Facilities (those that produce power for off-site use) are subject to the granting of a Use Permit, and may also require a Rezone to add the RE Renewable Energy Combining Zone depending on where the facility is located. The project would also be subject to both the General Development Standards for Renewable Energy Projects, and to the Special Use Standards, if applicable, for that type of facility (for example, wind or solar facilities).
Development Standards
The General Development Standards for Accessory Renewable Energy Systems (26.88.200.A) are outlined in a separate handout. The following General Development Standards would apply to all Renewable Energy Facilities that do not meet the definition of an accessory system:
- Important Farmlands are protected and may not be removed from agricultural use.
- Sensitive habitats including Biotic Resource areas, wetlands and streams must be avoided
- Visual analysis and Design Review approval are required
- Airport Safety is ensured by prohibiting facilities within airport turning or approach zones
- Compliance with the county’s Fire Safe Standards is required
- A Decommissioning Plan and Financial Assurance are required as part of the Use Permit
- Financial Assurances are required as part of the Use Permit