Grading Permit Fees

Permit and Resource Management Department Banner 750

Fee determinations are based on a number of variables.

Grading Permit variables include:

  • What is the total cubic yardage, including cuts and fills?
  • Will a site review be required?
  • Will Well & Septic review and/or clearance be required?
  • Will Fire Prevention review and mitigation measures be required?
  • Will an encroachment permit be required?
  • Will approvals or permits from outside agencies be required?

Drainage considerations that must be addressed include:

  • Location of structures (roads, reservoirs, underground utilities, etc.)
  • Location and limits of grading
  • Location of existing drainage facilities (waterways, conduits, culverts, or bridges)
  • Slope stability, erosion potential, and water quality related issues
  • Watershed hydrology and related issues
  • Flooding and other related drainage characteristics of the area
  • Existing wetlands, vernal pools, or riparian corridors
  • Proximity of leach field locations

Environmental Health Review variables include:

  • What type of permit(s) will be required?
  • What type of letter or certification is required?
  • Will a septic system or well serve the site?
  • Is public sewer and water service available?
  • How many lots are proposed?

Due to the complexity of these determinations, it is unwise to make assumptions until the full scope of a project is determined by Permit Sonoma staff at the time an application is accepted.

Please do not fill in amounts on checks prior to application acceptance.