Operational Permit & Monitoring Program Graduation
Changes to the State of California septic system regulations and a vote by the Sonoma County Board of Supervisors have allowed Permit Sonoma to remove thousands of systems from County’s Operational Permit Program. Property owners with these systems no longer are required to submit self-monitoring forms or pay annual fees. Permit Sonoma staff will no longer perform periodic on-site septic system inspections.
Why is this happening?
Permit Sonoma has aligned the Operational Permit Program for septic systems with the State of California’s Water Quality Control Policy for Onsite Wastewater Treatment Systems (State OWTS Policy). Section 9.4.6 of the State OWTS Policy requires local agencies, like Sonoma County, to monitor or inspect septic systems utilizing supplement treatment. Supplemental treatment may occur as part of the septic system design or through a separate pretreatment unit.
- OPR’s with supplemental treatment must continue to be included in the County’s Operational Permit Program.
- OPR’s without supplemental treatment have graduated from the County’s Operational Permit Program.
Approximately 3000 systems have graduated from the program and have been released and 1150 systems will remain.
Easements and Quit Claims
There most likely is an easement recorded on your property that allows County of Sonoma staff to access your property to inspect your septic system. If you would like this easement removed, please submit form WLS-052 Operational Permit (OPR) Easement Quit Claim Request (PDF).
Requests for easement quit claims will be processed in the order received and by payment of applicable fees for this service. The Easement Release fee (Fee ID 0379), can be found on the latest Well & Septic Fees. View latest Well & Septic OPR fees.
Corresponding OWTS Manual Changes
As part of this programmatic change, Permit Sonoma is also providing the following clarification regarding the current OWTS Manual version 7.0 that is being revised and pending approval. The following criteria will be in effect until such time the OWTS Manual version 7.0 is replaced by a future approved version.
- Only septic systems that utilize supplement treatment as part of the septic system design or through a separate pretreatment unit will be required to enroll in the county’s OPR program. (Addendum to OWTS Manual Section 14).
- Monitoring, observation, and/or performance wells will only be required on septic systems that utilize supplement treatment as part of the septic system design or through a separate pretreatment unit, or if the septic system design requires the installation of performance wells within the dispersal area. The Experimental Non-Standard Septic Systems, Bottomless Sand Filters and Gravel-less Pressurized Dispersal Channels, utilize supplement treatment as part of the septic system design. The Alternative Non-Standard Septic Systems, Mounds and At-Grades, require performance wells within the dispersal area but will not be required to enroll in the county’s OPR program unless a pretreatment unit is proposed or installed as part of the septic system. (Addendum to OWTS Manual Section 13).
- Pretreatment units will now be required on Shallow Trench Pressure Distribution (STPD) septic systems. STPD systems only require a minimum of 24 inches of soil below dispersal bottom instead of the typical standard of 36 inches. The mitigation measure applied to STPD systems to account for the reduction in soil depth was to be monitored as part of the county’s OPR program. To maintain the mitigation measure in place, pretreatment units and enrollment in the county’s OPR program will be required on STPD systems.
Translate